
Designed
Defined criteria, details and performance.
Construction direction and technical supervision
Technical follow-up to compare the project, materials, execution, issues and close-out records.
Request construction supervision01 · From drawing to site

Defined criteria, details and performance.

Materials, geometry and construction sequence.
Defined criteria, details and performance.
Materials, geometry and construction sequence.
Records and checks linked to each stage.
02 · Control at each stage
Follow-up structures decisions, records issues and checks the relevant work before each package is closed.

03 · Detection and correction

What differs and where it appears.

Impact, options and decision ownership.

The resolution recorded before work continues.
What differs and where it appears.
Impact, options and decision ownership.
The resolution recorded before work continues.
04 · Result
Close-out brings together checks, resolved issues and records that remain useful during handover and operation.

Share the documents, current stage and the decisions that need technical control.